CLP Black Point Power Station -D1 2019

HONG KONG-Black Point Power Station
High Mast and Pole Lighting

Year: 2019

  • Owner: CLP Power Hong Kong Limited
  • Designer: Ove Arup & Partners  Hong Kong Ltd
  • Contractor: Leighton Contractors (Asia) Ltd

DIMON Supply: High Mast Pole , Lighting Pole and LED Street light and Flood Light 

The Black Point D1 Combined Cycle gas turbine is a 550 MW Siemens SGT5-8000H gas turbine unit installed at CLP Power's Black Point Power Station in Hong Kong. Commissioned in mid-2020, this unit uses the latest CCGT technology, achieving an efficiency over 60%. The project was a key step for CLP Power to increase natural gas in Hong Kong's fuel mix to approximately 50% and reduce carbon emissions. 

Key Features: 

Capacity: 550 MW

Technology: Siemens SGT5-8000H H-class gas turbine.

Efficiency: Over 60%.

Purpose: To support the Hong Kong government's environmental targets by reducing carbon emissions and improving air quality.